2015 Resurfacing Project

The 2015 Resurfacing Project aimed to repair streets in need of maintenance as well as replacing old water and sanitary pipes.

  • Construction began 3/16/15 and has been completed.
  • Objectives
    • Resurface +/-6,000 feet of roads in fair – poor condition.
    • Replace +/-2,200 feet of water main pipe in poor condition.
    • Line or replace +/-1,900 feet of sanitary sewer pipe.
  • Areas Improved
    • Lincoln Street           North to Hickory
    • N. Stough Street      Quincy to South End
    • S. Stough Street      Chicago to Chestnut
    • Second Street          Monroe to Vine